The Guardian 13 kW Emergency Power System 5242 has been discontinued. Check out Expert's recommended alternatives for another top standby generators air-cooled generator. Enter your model or serial number to find Generac specifications, manuals, parts lists, FAQs, how-to videos, and more for your product.
Guardian Liquid-cooled 25 kW Generator
®
INTRODUCTION........................IFC
Read this Manual Thoroughly...................IFC
![]()
View and Download Lenovo Yoga Book C930 user manual online. Yoga Book C930 Laptop pdf manual download. Also for: Yb-j912l, Yb-j912f. Lenovo yoga book c930 user manual.
Operation and Maintenance....................IFC
How to Obtain Service........................IFC
Authorized Service Dealer Location..............IFC
SAFETY RULES..........................2
1.1Generator...............................4
1.2Transfer Switch..........................4
1.3Automatic System Operation................4
1.4Generator AC Connection Systems............4
1.5Main Circuit Breaker......................5
1.6Generator Fuel System.....................5
1.7Engine Protective Devices...................5
1.8Unpacking..............................6
1.9Lifting the Generator......................6
1.10Specifications............................6
1.11Fuel Consumption........................7
1.12Reconfiguring the Fuel System for LP Vapor.....7
Ge 13 Kw Generator
1.13Engine Oil Recommendations...............8
1.14Coolant Recommendations..................8
1.15Before Installation........................8
Section 2 — INSTALLATION..............8
2.1Standby Generator Installation..............8
2.2Generator Location........................9
Guardian 13 15 Kw Generator User Manual Free
2.3Generator Mounting and Support............9
2.4Basic Standby Electric System...............9
2.5Emergency Circuit Isolation Method..........10
2.6Total Circuit Isolation Method..............10
2.7Grounding the Generator..................10
2.8Generator AC Neutral Connections...........10
2.9Using an Engineered “GTS” Transfer Switch ...10
2.10Battery Installation.......................11
2.11Preparation Before Start-Up................12
Section 3 — OPERATION................12
3.1Engineered GTS Transfer Switch............12
3.2Control Console Components...............13
3.3Manual Transfer and Startup...............14
3.4Engine Governor Adjustments ..............14
3.5Retransfer and Shutdown..................15
3.6Automatic Operation.....................15
3.7Weekly Exercise Cycle.....................15
3.8Control Board DIP Switch Settings..........16
Section 4 — MAINTENANCE.............16
Service Facilities.........................16
4.2Exhaust Manifold Procedure...............17
![]()
4.3Intake Manifold Procedure.................17
4.4Cylinder Head Procedure..................17
4.5Cooling System..........................17
Electrical System........................18
4.7Checking Fluid Levels....................18
Can Perform............................18
4.9Miscellaneous Maintenance................20
4.10Scheduled Maintenance...................21
Section 6 — NOTES....................25
Section 8 — EXPLODED VIEWS AND
Section 9 — INSTALLATION DIAGRAM .....51
Section 10 — WARRANTY................52
Comments are closed.
|
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |